FusionDC1000B Prefabricated Modular Data Center
Quick Guide (2020, Nigeria, Platform Capital
Refinery DC)
This chapter describes the notes for using the quick guide.
Issue 01 (2021-01-05)
Before the installation, check whether the materials are intact according to
the packing list. If there is any problem, contact Huawei technical support.
This document provides only the initial configuration parameters required for
data center commissioning and O&M as well as the drawings and parameters
required for onsite installation.
Before using this document, read through and keep in mind the safety
precautions and the cautions and notes for operations.
Precautions provided in this document are only supplementary to the local
laws and regulations governing the data center.
The system configuration parameters are essential to reliable running of the
system. Improper modifications of parameters may easily cause abnormal
running status, or even damage to the system. You are not allowed to modify
configuration parameters without permission when using the data center. If a
modification is necessary, contact Huawei technical support. Huawei shall not
be responsible for any loss caused by unauthorized configuration
modification.
You can modify initial configurations under the guidance of Huawei
engineers. Huawei assumes no liability for any loss caused by unauthorized
changes to the initial configurations.
Some parameters mentioned in this document should be provided and
configured by onsite technical support engineers based on the actual
application of the data center.
If parameters need to be modified during the running of systems, the
operator should be a professional in this field and familiar with each system
and its working principles.
Before performing an operation, ensure that the prerequisites are met.
Otherwise, the expected result may not be achieved. More seriously,
equipment damage and personal injury may occur.
Put on necessary protective equipment such as the safety helmet and gloves
before entering the site.
A data center can be powered on for commissioning only after it has been
installed and passed the installation check.