Download Print this page

Huawei FusionDC1000B Quick Manual page 33

Hide thumbs Also See for FusionDC1000B:

Advertisement

NO.S002 Pre-fab. Module Base Installation Position Diagram
A2
A1
1. Each base has eight mounting holes. Only four mounting holes are required. The
external four holes are preferred. If the external holes are conflict with the concrete
podium or ground reinforcement, use the internal holes.
2. Dual-capacity bases are installed in the middle, and single-capacity bases are installed
on the upper and lower sides. Ensure that the direction of the bases is consistent with that
in the drawing.
3. Single-capacity and dual-capacity bases are used only for securing the positions where
corner fittings exist. Others are used for support (without T-shaped bolts M20).
Single-capacity base component
Enlarged at 5:1
Dual-capacity base component
Enlarged at 5:1
DKBA40703509.ASM
2
Dual-capacity base component
DKBA40703508.ASM
1
Single-capacity base component
No.
Drawing No.
370
290
250
430
560
480
440
620
5
10
Item
Qty
Remarks

Advertisement

loading