Huawei FusionDC1000B Quick Manual page 17

Hide thumbs Also See for FusionDC1000B:

Advertisement

FusionDC1000B Prefabricated Modular Data Center
Quick Guide (2020, Nigeria, Platform Capital
Refinery DC)
Step 9 Install left and right aisle door panels.
1.
Issue 01 (2021-01-05)
Figure 2-11 Installing the cover for the cable trough
Push the aisle door panels into the guide rail from both ends.
Copyright © Huawei Technologies Co., Ltd.
2 Installing an Aisle Door and an Access Control
Device Between Combined Pre-fab. Modules
12