FusionDC1000B Prefabricated Modular Data Center
Quick Guide (2020, Nigeria, Platform Capital
Refinery DC)
Figure 2-5 Installing the dampers
Step 4 Secure the guide rail to the fixed arm using screw assemblies.
1.
Issue 01 (2021-01-05)
Remove the plugs and bumpers from both ends of the guide rail.
NO TE
Set the removed plugs and bumpers aside.
Copyright © Huawei Technologies Co., Ltd.
2 Installing an Aisle Door and an Access Control
Device Between Combined Pre-fab. Modules