Download Print this page

Huawei FusionDC1000B Quick Manual page 21

Hide thumbs Also See for FusionDC1000B:

Advertisement

FusionDC1000B Prefabricated Modular Data Center
Quick Guide (2020, Nigeria, Platform Capital
Refinery DC)
Step 13 Install a magnetic lock.
1.
2.
3.
Issue 01 (2021-01-05)
Figure 2-16 Installing the cable chain
Install magnetic lock fastener 1 onto the guide rail, as shown by (1) in
2-17.
Install the magnetic lock onto magnetic lock fasteners 1 and 2, as shown by
(2) and (3) in
Figure
Connect cables to the magnetic lock by referring to the "Connecting Cables"
chapter.
Copyright © Huawei Technologies Co., Ltd.
2 Installing an Aisle Door and an Access Control
Device Between Combined Pre-fab. Modules
2-17.
Figure
16