Download Print this page

Huawei FusionDC1000B Quick Manual page 36

Hide thumbs Also See for FusionDC1000B:

Advertisement

NO.S006 External Sealing Material Installation Position
Diagram
4.GB9074_4-88_M4X12_S(8 PCS)
Install
Attach roll
Apply sealant
rubber
strip
Note:
1. The installation sequence of external sealing materials is as follows:
1) Install T-shaped rubber strips at the top and end, as shown in the figure.
2) Attach waterproof rolls to the top and end and apply sealant to the gap of the rolls, as shown in the figure.
3) Install the top cover, front cover, and rear cover, and secure them using GB9074_17-8_M10X40_S_ZNAL screws.
4) Install the corner fitting cover and secure it using GB9074_4-88_M4X12_S screws.
5) Attach the top clamping plate gap sealing roll and screw hole roll, and apply sealant to the gap of the rolls.
6) After all external sealing kits are installed, install internal bottom sealing kits for combined modules by referring to
NO.S007Pre-fab. Module Internal Combining Material Installation Position Diagram-1.
5.GB9074_17-88_M10X40_S_ZNAL(48 PCS)
Install cover
DKBA04853091_100X800
9
Clamping plate gap sealing roll
8
DKBA04853091_100X800
Screw hole roll
7
DKBA04853091_20000X500
Waterproof roll
DKBA04853056_20000
T-shaped rubber strip
6
GB9074_17-88_M10X40_S_ZNAL
Stainless steel screw
5
4
GB9074_4-88_M4X12_S
Stainless steel screw
3
DKBA82990593.ASM
Corner fitting cover
DKBA82990596.ASM
Top clamping plate
2
DKBA82990592.ASM
End clamping plate
1
No.
Drawing No.
5
t=2mm
12
t=2mm
1
t=2mm
1
48
8
4
6
6
Item
Qty
Remarks

Advertisement

loading