NO.S007 Pre-fab. Module Internal Combining
Material Installation Position Diagram-1
Install Armaflex
Install thermal
thermal insulation pipe
insulation foam
Note:
1. Install the bottom module combination materials in the following sequence:
(1) Insert the Armaflex thermal insulation pipe, and use the existing mounting holes to install the bottom connecting
kits to connect and secure the modules.
(2) Attach bottom thermal insulation foam 1 and 2 to the vertical beam at the bottom of the module. Then install
thermal insulation foam 2 on both sides, and ensure that the thermal insulation foam is aligned with the side of
thermal insulation foam 1 (see the enlarged view in A).
(3) Install the cover legs by using the mounting holes on the vertical beam at the bottom of the module.
(4) Install the bottom cover component (the ESD veneer is attached to the cover and installed together), and secure
the component to the profile surface using tapping screws (GB15856_1-2002_ST4_8X25).
(5) Install the top sealing kits inside combined modules by referring to NO.S007 Pre-fab. Module Internal Combining
Material Installation Position Diagram-2.
A
7. Connector
Cover leg mounting hole M18
7. Connector
Install leg
Install cover
1. ESD veneer
Pre-installed
2. Bottom thermal
insulation foam 1
3. Armaflex thermal
4. Bottom cover leg
insulation pipe
8
DKBA82031210.ASM
Bottom thermal insulation foam 2
7
DKBA82019111.ASM
DKBA83116515.ASM
6
DKBA04800086_20X32X1965
Thermal insulation foam 2
5
4
DKBA81070328.ASM
3
DKBA80998528.ASM
Armaflex thermal insulation pipe
DKBA82031209.ASM
2
Bottom thermal insulation foam 1
DKBA83116516.ASM
1
No.
Drawing No.
8. Bottom thermal insulation foam 2
6. Bottom cover
5. Thermal insulation foam 2
Bottom internal sealing
2
2
3
Connector
Bottom cover
2
12
Bottom cover leg
40
12
19
ESD veneer
2
Item
Qty Remarks