Spring-Board; Installation Of Cylinder On Spring-Board - HE-VA Tip-Roller Operating Instructions Manual

Hide thumbs Also See for Tip-Roller:
Table of Contents

Advertisement

UK
Tip-Roller 6,3 - 7,3 - 8,2 - 9,5 - 10,2
15-01-2021

Spring-Board

The Spring-Board requires 1 double-acting Hydraulic outlet on the tractor. The tine angle is hydraulically
controlled from the driver's cab and the depth control is done manually. The tine work independently, but
may be connected by means of transverse locking fittings (additional equipment) if a greater levelling
effect is required. The change-over is done very easily and quickly without any tools.

Installation of Cylinder on Spring-Board

The hydraulic cylinders are installed as shown below. It is important that the installation is performed
properly to get the correct force on the cylinders.
The ring type decides whether the cylinders must be installed in hole 1 or 2. If the machine has 450 or
550 mm rings, the cylinders must be located in hole 1 and hole 1a or 1b. If with 620 mm rings, the
cylinders must be located in hole 2 and hole 2a or 2b.
12

Advertisement

Table of Contents
loading

Table of Contents