Front Panel LEDs
The ONT provides front panel LEDs to display status information. The ONT LEDs and status
descriptions are shown in Table 7.
Label
PWR
Network
Status
POTS 1 and 2
ETH 1 and 2
Secure the Unit
At the conclusion of successful turn up and testing, the unit must be secured using the
following procedure.
1. Close the ONT door while checking for interference and ensuring all cables are properly
2. Tighten the captive security hex head screw with the security tool (216‐Type can
Installation of the unit is now complete. The unit is ready for service.
Test for POTS Line Faults
Look at the "TELEPHONE TROUBLESHOOTING" instructions on the front of the Electronics
Module for directions in determining line faults.
NOTE
If the problem is still not corrected, it is possible there is an internal wiring
problem with the residence.
61187715G1-5B
Status
Off
Green
Green
Yellow
Red
Off
Green
2
Green Flashing
Off
Green
4
Yellow Flashing
positioned. Do not force the door closed.
wrench). The cover is secure when the screw reaches the bottom of its travel. Do not
overtighten.
Table 7. Front Panel LEDs
Description
No power
Power is ON
OLT has activated the ONT
OLT is discovering and ranging the ONT
The OLT has shut down ONT
Fiber is disconnected, or GPON interface is down
At least one port is Off Hook
At least one port is Ringing
Links down: no activity or Administratively Shut
Down
10/100/1000 Link is up
TX or RX activity
Commissioning and Testing
39