Setting Up The Labeling System; Connecting The Labeling Station - Weber Geset 117 Original User Manual

Table of Contents

Advertisement

Chapter 6 Installation and initial startup

Setting up the labeling system

Requirements
The labeling system is unpacked and prepared (see the chapter: "Transport" on
page 25) near the labeling site in the area of the installation site.
The base is solid, level and flat.
The labeling system and if applicable the turning plate must be completely installed.
The connections for the compressed air and electricity are close to the labeling site
(maximum distance of 1.5 m) as specified in the chapter: "Specifications" on page
22).
Required equipment
¥
Flat wrench
¥
Spirit level
¥
If applicable 2-3 persons
Instruction
Set a labeling system up as follows.
Step
1
2

Connecting the labeling station

The labeling station requires electricity to work. For details see the chapter:
"Specifications" on page 22.
Version: 15.01.14
Procedure
Move the labeling system to installation site. Move labelers without rolls
piece by piece diagonally. Consider all points for "Placing the labeling
system" on page 30.
Adjust the labeling system with an air lever by the adjustable feet
horizontally. (With rolls, the brakes have to be locked). See also "Adjust
base conveyor".
page 31 of 59
40002674 BTA Geset 117
GB

Advertisement

Table of Contents
loading

Table of Contents