Initial Operation; Cartridge Pack Installation - Thermo Scientific Nanopure Analytical 1367 Series Operating Manual And Parts List

Ultrapure water system
Hide thumbs Also See for Nanopure Analytical 1367 Series:
Table of Contents

Advertisement

Cartridge Pack
Installation
Thermo Scientific

Initial Operation

Section 7
Cartridge packs will come bagged with four manifold connection caps.
Part
Application
Diamond Kit Organic Free R/O & Distilled Feed
D50280
Ultra-Low Organics, Type 1 Water, Reverse Osmosis or Distilled Water Feed
Diamond Kit Organic Free Deionized Feed
D50281
Ultra-Low Organics, Type 1 Water, Deionized Water Feed
DIamond Kit Type 1 R/O & Distilled Feed
D50282
Low Organics, Type 1 Water, Reverse Osmosis or Distilled Water Feed
Diamond Kit Type 1 Deionized Feed
D50283
Low Organics, Type 1 Water, DI Water Feed
Each cartridge pack includes one 0.2 micron absolute final filter.
Warning Depressurize system prior to removing cartridge pack.
1. Open front (left side) door.
Turn the cartridge pack so
the caps are facing you.
Remove the caps.
2. Verify that each of the four
posts on the cartridge pack
has an o-ring.
3. Lift unit manifold upwards,
insert cartridge pack and
align the pack so that it
mates with the unit
manifold.
4. Lower unit manifold until it
is flush with the top of the
cartridge pack.
Manifold
Figure 7-1. Cartridge Pack Installation
Nanopure™ Analytical
s
7-1

Advertisement

Table of Contents
loading

Table of Contents