Start Your System Into Operation - Thermo Scientific Barnstead GenPure Operating Instruction

Ultrapure water system
Hide thumbs Also See for Barnstead GenPure:
Table of Contents

Advertisement

Start your system into operation

Step
Action
1
Either place the system on the intended surface or
hang it on a wall. For wall mounting using the
included wall mounting hardware.
2
Release the cartridge cover by pressing the push
button.
3
Locate the ultrapure cartridge and fit the
cartridge into the system.
4
Push each of the quick connectors onto the
cartridge. You will know they are attached when
an audible "click" is heard.
Fit the cartridge cover on again.
5
Unscrew the yellow stopper from the feedwater
connection of the system. Mount the connecting
hose with 3/4" female thread nut which is
supplied in the assembly kit to the feedwater
connector of the system.
The other end of the hose with 3/4" female
thread connects to pretreated water supply or an
pre-treatment (see under chapter
example GenPure with Ion exchanger DI 1500
(option)"
Only feedwater that has been pretreated by
reverse osmosis, ion exchange or distillation is to
be used.
Thermo Scientific
• Verify after installation that the tubing have the right positions on the systems
panel and there is no leakage after open the feedwater supply tap.
• To avoid tripping over the tubings, observe that the tubings are not lay over the floor.
"Mounting
on
page
31).
Start your system into operation
Figure
See under chapter
"Wall mounting"
page
27".
Quick
connectors
Ultrapure
cartridge
7
Installation
on
Push-button
Cartridge cover
Outlet
Inlet
Feedwater
connecting
Yellow
stopper
GenPure
25

Advertisement

Table of Contents
loading

Table of Contents