Putting system into operation
1. Feedwater connection system 0.31" (8 mm) o.d
2. Rinse water connection system 0.31" (8 mm) o.d
3. Connection 0.31" (8 mm) o.d xCAD flow (to Server)
4. Connection 0.31" (8 mm) o.d xCAD back flow (from server or Client)
5. Connection 0.31" (8 mm) o.d xCAD flow (Server)
6. Connection 0.31" (8 mm) o.d xCAD back flow (Server)
7. Connection 0.31" (8 mm) o.d xCAD flow (Client)
8. Connection 0.31" (8 mm) o.d xCAD back flow (Client)
Thermo Scientific
The system must have cooled down, or warmed up, to room temperature before
being put into operation.
Check that all connections have been made as described above.
10
GenPure
55