Installation Of Degree Of Protection Version Ip31D; Ip31D - Protection Against Vertically Falling Water Drops - Siemens 8DB10 Installation And Operating Instructions Manual

Extendable fixed-mounted circuit-breaker switchgear up to 40.5 kv
Table of Contents

Advertisement

Fig. 145: Overview: Degree of protection version IP31 for panels
Mounting protection
plates (if not pre-
assembled at the factory)
Fig. 146: Example: Fastening protection plate for end panel and intermediate panel
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06
31

Installation of degree of protection version IP31D

31.1

IP31D - protection against vertically falling water drops

➭ On the roof plates of the panels, the sealing tape was pre-assembled at the factory.
➭ Mount protection plates for intermediate and end panels. To do this, use bolts M6 x 25.
Protection plate for left end panel
Sealing strip for intermediate panels
Protection plate for intermediate panels
Protection plate for right end panel
Sealing tape between the individual
panels, and between roof plate and
protection plate
Protection plate for left end panels
(6 bolts M6 x 25)
Protection plate for intermediate
panels (6 bolts M6 x 25)
Sealing tape
Installation
133/214

Advertisement

Table of Contents
loading

Table of Contents