Siemens 8DB10 Installation And Operating Instructions Manual page 117

Extendable fixed-mounted circuit-breaker switchgear up to 40.5 kv
Table of Contents

Advertisement

Fig. 126: Solid-insulated bar
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06
➭ Mount solid-insulated bar.
➭ Bolt the pressure ring of the solid-insulated bar together with the busbar housing using
6 bolts M8 x 45 (including washer and spring washer). Tightening torque: 20 Nm.
Fig. 127: Fixing points for the pressure ring
of the solid-insulated bar
➭ The solid-insulated bar is disassembled in reverse order: Remove the bolts at the pressure
ring of the solid-insulated bar. Remove the solid-insulated bar and bolt the cover onto
the connection housing.
Solid-insulated bar with integrated
pressure ring (
Pressure ring
Contact bolt
Sealing ring
Connection cover for solid-insulated bar
Solid-insulated bar
Pressure ring
Connection cover for solid-insulated bar
Busbar housing
Installation
)
117/214

Advertisement

Table of Contents
loading

Table of Contents