864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06
➭ Mount the gas-insulated bar.
➭ Bolt the pressure ring of the gas-insulated bar together with the busbar housing using
8 bolts M8 x 20. Tightening torque: 20 Nm.
Fig. 137: Fixing points for the pressure ring of
the gas-insulated bar
➭ The gas-insulated bar is disassembled in reverse order: Remove the bolts at the pressure ring
of the gas-insulated bar. Remove the gas-insulated bar and bolt the cover onto the
connection housing.
①
Gas-insulated bar
(with integrated pressure ring
②
Pressure ring
③
Sealing ring
④
Connection housing
①
Gas-insulated bar
②
Pressure ring
③
Connection housing
④
Busbar housing
Installation
②
)
123/214