Installation
Evacuating the busbar run
with the vacuum pump
Filling the busbar run
with an SF
gas cyclinder
6
86/214
➭ Determine the size of the desiccant bags required for each busbar housing and
place the originally packed desiccant bags at the corresponding covers.
➭ Take the desiccant bags out of the packings and lay them completely into the associated
holder in the covers.
➭ Put the busbar covers with the bags into position. Observe that no part of the bags is
jammed in the contact surfaces in order to prevent leaks.
➭ Bolt the covers tight crosswise. Tightening torque: 20 Nm.
Before filling SF
gas in, the air must be removed from the busbar run to be filled with gas
6
(evacuation). One of the covers next to the right and left end panel of the switchgear contains
the pressure indicators and gas filling valves for all busbar runs.
Evacuating a five-panel busbar run takes about 30 to 40 minutes.
Fig. 86:
Gas pressure manometers and
gas filling valves at the switchgear front
➭ Undo the locking cap of the gas filling valve ② for the completely closed busbar run.
➭ Connect the vacuum pump to the valve of the busbar run ② . Use short tubes with
the largest inside diameter possible.
➭ Evacuate the housings down to a pressure of less than 2 kPa.
Manometer indication: -100 kPa. Measure the pressure with the vacuum pump locked.
➭ Depending on the inside diameter and length of the vacuum pump tube, let the pump
operate for another 5 to 15 minutes.
➭ Remove the pump tube. The valve in the gas filling valve closes automatically.
➭ Determine the filling pressure required according to the rating plate
(see page 48, "Rating plates") and the data given in Section "Insulating gas SF
(see page 44, "Insulating gas SF
➭ Connect the SF
gas cylinder to the gas filling valve of the evacuated busbar run.
6
➭ Fill SF
into the busbar run until the necessary pressure is reached. Check the filling pressure
6
on the pressure indicator of the busbar run and on the pressure indicator of the gas filling
equipment.
➭ Remove the connecting tube of the gas cylinder from the gas filling valve.
The gas filling valve closes automatically.
Revision 06 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • 864-5091.9
Manometers of the SF
compartments for busbars L1, L2, L3 of
busbar system 1
Manometers of the SF
compartments for busbars L1, L2, L3 of
busbar system 2
Manometer for three-position
disconnector housing in busbar system 2
Manometer for circuit-breaker housing
Manometer for three-position
disconnector housing in busbar system 1