Section 3
3.1

Preparations

The final steps in this installation consists of applying AC power to the controller
followed by programming the controller. Before you apply AC power, do the
following: (1) review the Checklist below and (2) fill out the System Start-up List
on the next page to confirm that all installation steps have been completed.
Do not make any wiring connections at the tanks, junction boxes, controller, or
any other location when power is applied to the controller.
WARNING
3.2

Checklist

Before you apply power to the controller, re-inspect the installation using the
following checklist as a guide:
Installation Manual

Applying Power

Failure to comply can create an electric shock or
explosion hazard causing death, personal injury, or
property damage.
All probe and sensor installations have been completed.
All conduit, junction boxes, and Eys installations have been completed (inside
and outside the building).
All cable and wiring connections have been completed.
All wiring connections in the controller have been completed (including earth
ground and field ground).
Controller is field grounded to the main electrical service power, not a sub-
panel.
All installations have been re-inspected.
All installations comply with the instructions in this manual, National Electrical
Code, and the federal, state, and local codes and regulations.
Close the metal cover inside the controller.
Close the controller door.
OEL8000II
3-1