5.8 Ethernet Communication System (Optional)

Connect the WiFi or E-Net module produced by SUNGROW to the communication
accessory port. After successful connection, information such as power generation and
running state of the inverter can be viewed via the App on the phone.
The block diagram of the Ethernet communication system is as follows:
The Ethernet communication and the RS485 communication are not available at
the same time. Otherwise, communication failure or other problems can be
caused.
For details on module installation and configuration, refer to the manual
delivered together with the module.

5.9 Smart Energy Meter Connection (Optional)

The inverter is equipped with the feed-in power limit function, so as to meet the
requirements of some national standards or grid standards for the output power at the
grid connection point. For the setting of feed-in power limit, refer to the section
Feed-in Limitation
Contact SUNGROW to ensure if the Smart Energy Meter model is available
locally.

5.9.1 On the Smart Energy Meter Side

For details, refer to the Quick Installation Guide of Smart Energy Meter.
(Optional)".
5 Electrical Connection
"7.7.4
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg6ktl-mtSg8ktl-mSg10ktl-mSg12ktl-m

Table of Contents