Electric Steam Generator (Optional Equipment) - BÖWE M12 Instruction Manual

Hide thumbs Also See for M12:
Table of Contents

Advertisement

6.
Operation

6.1.10. Electric Steam Generator (Optional Equipment)

The electric steam generator supplies the heater battery on the drycleaning machine. The steam
generator fills with water and regulates the water level fully automatically. The operating pressure is
5 bar (87 psi). A pressure control switch, which is adjusted at the factory, controls the pressure.
Safety valve 8.5 bar (123.3 psi), steam pressure gauge, overheating protection, thermal sensor,
drain valve and level sensor are built in.
When you turn the machine on, the water is brought to the correct level automatically.
Aerating the steam line:
The steam line is aerated automatically. The aeration line (Ø 6 mm or .2 in) is fed to the sewer line.
When the electric steam generator cools off, an underpressure forms; this is an indication of proper
aeration and sealing.
Note:
In case the heating up temperature is not reached, a note will appear on the display. This can be
remedied by a new start of drying.
Switching pressure on the pressure control switch (1): ON
C
A
Steam generator
B
Water inlet
C
Heater battery
D
Aeration
1
Pressure control switch
2
Pressure gauge
3
Safety valve
30
D
A
4
5
6
7
8
9
10
5.0 bar (72.5 psi)
OFF
5.4 bar (78.3 psi)
1
2
B
3
6
7
8
9
Check flap
Filling valve
Level sensor (fill level)
Level sensor (Overheating protection)
Temperature sensor
Drain valve
Check valve (without spring)
6.
4
5
10
707766-03-0
M12/M15/M18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M15M18

Table of Contents