Lines And Pipelines; Steam; Condensate - BÖWE P25 Installation Instructions Manual

Hide thumbs Also See for P25:
Table of Contents

Advertisement

7
Connection
7.2

Lines and Pipelines

Connect the customer-supplied supply and drain lines according to the information in the
dimensioned drawing. Steam, condensate, compressed air and water must be equipped with stop
valves. Follow DIN 1988 when connecting the water. To avoid transmission of structure-borne noise,
you can connect the pipelines with a spacer of flexible metal tubing and insulate the pipe holders.
7.2.1

Steam

Install the wiring system and connections.
Operating pressure 4 - 5 bar (58 - 72.5 psi) saturated steam.
If the admission pressure is more than 5 bar (72.5 psi), build in a reducing valve with pressure gauge
and set it so that the highest permissible temperature for perc of 150 °C ( 302 °F) (measure!) is not
exceeded (danger of solvent decomposition and damage to the machine).
Peak steam demand (large steam generator):
Drying
Distillation
1 = reducing valve
2 = vacuum breaker
3 = descending slope
4 = steam trap
5 = stop valve
6 = non-return valve
7 = drain
7.2.2

Condensate

Install condensate line so that it slopes away from the machine, if possible. If there is an ascending
slope, provide a non-return valve and drain at the lowest point.
Attention:
Condensate counter-pressure must be at least 1.5 bar (21.8 psi) under the
incoming steam pressure.
24
0.5 kg/min (1.1 lb/min)
0.8 kg/min (1.8 lb/min)
7
7.2
703904-20-0
P25/P30

Advertisement

Table of Contents
loading

This manual is also suitable for:

P30

Table of Contents