Lowara e-LNEEE Installation, Operation And Maintenance Manual page 22

Smart pump range
Table of Contents

Advertisement

en – Original instructions
Table 6: Power supply wiring procedure
1. Open the terminal box cover (2) by removing the screws (1).
2. Insert the power cable in the M20 cable gland (5)
3. Connect the cable according to the wiring diagram.
4. Connect the earth conductor (mass), making sure that it is longer than the phase conductors.
5. Connect the phase leads.
6. Close the cover (2) and tighten the screws (1).
Table 7: I/O wiring procedure
1. Open the terminal box cover (2) by removing the screws (1).
2. Connect the cable according to the wiring diagram.
3. Close the cover (2) and tighten the screws (1).
208÷240
380÷460
Figure 12: Wiring diagram
22
1~
L
N
3~
L1
L2
L3
10 A
Reference
Fig. 9
Fig. 12
Fig. 9
Reference
Fig. 9
Fig. 13
Fig. 9
1
2
3
ESM_M0007_B_sc
4
L1
3
L2
2
L3
1
ESM_T0008_D_sc

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-lneseE-lnteeE-lntse

Table of Contents