en – Original instructions

2 Transportation and Storage

Packaging inspection
1. Check that quantity, descriptions and product codes match the order.
2. Check the packaging for any damage or missing components.
3. In case of immediately detectable damage or missing parts:
In both cases, promptly contact Xylem or the Authorised Distributor from whom the product was
purchased.
Unpacking and inspection of the unit
1. Remove packing materials from the product.
2. Release the product by removing the screws and/or cutting the straps, if fitted.
CAUTION: Cut and abrasion hazard
Always wear personal protective equipment.
3. Check the product for integrity and to make sure that there are no missing components.
4. In case of damage or missing components, promptly contact Xylem or the Authorised

2.1 Unit handling

The unit must be harnessed and lifted as shown in Figure 1.
Figure 1: Lifting
10
 Accept the goods with reserve, indicating any findings on the transport document, or
 Reject the goods, indicating the reason on the transport document.
Distributor.