Installing The Ne0152T In A Lenovo Idataplex Rack - Lenovo ThinkSystem NE0152T Installation Manual

Table of Contents

Advertisement

Installing the NE0152T in a Lenovo iDataPlex Rack

Statement 26
44
NE0152T Installation Guide
This section describes how to install the NE0152T in a Lenovo iDataPlex rack. The
iDataPlex mounting kit allows the switch to be mounted either horizontally or
vertically.
The kit must be purchased separately. It includes the following parts:
Table 11.
Lenovo Adjustable 19" 4-Post Rail Kit parts
Item number
Description
1
Switch front brackets
2
M4 screws
3
M6 screws
4
M6 clip nuts
5
Switch rear brackets
6
Rear alignment plates
Attention: The rack-mounting frame may not be able to support the weight of the
networking switch with only the front post mounting brackets (2-post application).
If the switch has an undesirable amount of sag, it is recommended to use a 4-post
mounting kit.
Attention: For earthquake stability, mount the switch in a 4-post rack.
CAUTION:
Do not place any object on top of rack-mounted devices.
Quantity
2
16
8
8
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem ne0152t rackswitch

Table of Contents