2.1
2.1
Installation
Installation
2.1
2.1
Installation
Installation
�
Tighten the screws to fix the pump.
�
The inlet and outlet must be installed vertically.
�
The inlet tubes should not be too long, and make the foot valve
10-30mm above the bottom of the tank ( it can be 50mm if the liquid is
with heavier dirt)
�
Install the outlet tubes and injection valve. Back pressure valve
should also be installed if it is open discharging.
- 6 -
Need help?
Do you have a question about the Precision-24 and is the answer not in the manual?