TURN THE POWER OFF AT THE CIRCUIT BREAKER BEFORE
INSTALLATION
For ease of installation, Pass & Seymour/Legrand recommends use of a deep
wall box.
1. Disconnect power to circuit by turning circuit breaker OFF before installation.
2. Remove the existing wall plate and switch, if one is present.
3. Strip existing wires
on a LightSense™ device, both wires must be the same gauge (12AWG
or 14AWG).
4. Wire the LINE (black), LOAD, NEUT (white) and GND (green or bare) supply
and load wires to the correspondingly marked screw terminals, according to
the wiring diagram below.
5. Attach the wall plate.
6. Switch the circuit breaker back ON.
Visit our website for FAQs: www.passandseymour.com
INSTALLING THE DEVICE.
1 /
. If two wires will be connected to the same terminal
2 "
INSTALL IN COMPLIANCE WITH ALL
APPLICABLE CODES & STANDARDS.
Failure to follow these instructions may cause
personal injury or equipment damage.
LOAD
WIRE
NEUT
LOAD
CAUTION
GND
LINE
SUPPLY
WIRE