Toshiba TH650A Maintenance Manual page 50

Industrial robot
Hide thumbs Also See for TH650A:
Table of Contents

Advertisement

Plate
Axis 4 motor
base
Axis 4 motor
pulley
Guide
11)
Draw out the axis 4 timing belt upward, then set a new belt.
12)
Secure the ball screw nut and ball screw spline shaft which were disconnected
in Step 10) above, and nut flange to the arm 2, using the four (4) bolts (M5 ×
16). At first, tighten the bolts temporarily. Move the shaft up and down by
hand and make sure that it moves smoothly, then tighten the bolts completely.
*
A phase mark is provided on both the ball screw spline shaft and ball spline
nut. For details, see Step 5) of Para. 2.7.5.
Attach the axis 3 nut pulley to the ball screw nut with the four (4) bolts (M6 ×
13)
20).
M5×16
Ball screw spline shaft
M5×10
Stopper
M5×30
Tool flange
Old belt
– 50 –
MAINTENANCE MANUAL
M6×20
Axis 3 nut pulley
Nut flange
Axis 4 timing belt
Ball screw nut
Ball spline nut
Knock
(6 drill,
4 paces)
M5×16
New belt
STE 85306

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts3100

Table of Contents