Installation - CTEK HOME LOAD BALANCING WITH CHARGESTORM CONNECTED 2 Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Installation

The Ethernet cable can be connected to the CHARGESTORM® CONNECTED 2 through
one of the two pre-drilled holes on the top� If you prefer to connect the cable from the
bottom, you must drill additional holes� Make sure to seal the gap between the cable
and the box with a cable gland�
1�
Install the CHARGESTORM® CONNECTED 2 according to the installation man-
ual for the charging station� Refer to reference 1 on page 7�
2�
Install the energy meter�
4�
6�
8�
CTEK E-Mobility AB
3�
5�
7�
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HOME LOAD BALANCING WITH CHARGESTORM CONNECTED 2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

40-466

Table of Contents