Materials needed
1 CHARGESTORM® CONNECT-
1�
ED 2� (Not included in the kit�)
2�
1 energy meter with female RJ45
connector�
3�
1 control board adapter cable with
female RJ45 connector�
4�
1 Ethernet cable, for example Cat5/Cat6 with external shield, to connect the
charging station to the energy meter (not included in the kit)�
Overview of the installation
4