Chapter 3 Installation; Required Tools; Unpacking The 6E123-50 And 6E133-49 - Cabletron Systems SmartSwitch 6000 User Manual

Microlan smartswitch 6000 interface modules
Hide thumbs Also See for SmartSwitch 6000:
Table of Contents

Advertisement

Only qualified personnel should install the 6E123-50 and
6E133-49.
This chapter covers the following items:

Required tools

Unpacking the 6E123-50 and 6E133-49

Installing the 6E123-50 and 6E133-49 in the 6C105 chassis
(Section
3.4)
Connecting to the network
3.1
REQUIRED TOOLS
A Phillips screwdriver is required to install the Fast Ethernet Interface
Modules in the 6E123-50.
3.2
UNPACKING THE 6E123-50 AND 6E133-49
1.
Open the box and remove the packing material protecting the module.
2.
Verify the contents of the carton as listed in
Table 3-1 Contents of 6E123-50 and 6E133-49 Carton
6E123-50 and 6E133-49 User's Guide
CHAPTER 3
INSTALLATION
(Section
3.1)
(Section
Item
6E123-50 or 6E133-49
Release Notes
RJ21 Angle Adapter
(Section
3.2)
3.5)
Table
3-1.
Quantity
1
1
4
3-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartSwitch 6000 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Smartswitch 6e123-506m146-04Smartswitch 6e133-49

Table of Contents