RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completing the DFE‐Platinum module installation depends on if the module is being
installed in:
•
a new DFE‐Platinum module system (refer to "Completing the Installation" on
page 3‐21), or
•
an established, operating DFE‐Platinum module system (refer to "Completing the
Installation in an Existing System" on page 3‐23).
Completing the Installation of a New System
In a new system of DFE‐Platinum modules, one of the installed DFE‐Platinum modules
will become the management module on chassis power up, and all DFE‐Platinum
modules will automatically be set to the factory default values. A complete list of the
factory default values are provided in Chapter 3 of the Enterasys Matrix DFE‐Platinum
Series Configuration Guide.
After installing all DFE‐Platinum modules into the host chassis and making the
connections to the network, proceed to the following First‐Time Log‐In Using a Console
Port Connection procedure to access the module management startup screen from your
PC, terminal, or modem connection.
Modem Port Adapter Wiring and Signal Diagram
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator
DFE-Platinum Series Hardware Installation Guide 3-21
Completing the Installation