(8) Fasten the hexagon socket set screws (a total of 3 screws 130-1) on the side of the sleeve
retainer (111-4) of the cartridge mechanical seal (111), and secure the cartridge mechanical
seal (111) to the shaft.
Push down the sleeve retainer (111-4) of the cartridge mechanical seal
Note
(111) until stops. And then, fasten the hexagon socket set screws (a
total of 3 screws 130-1).
(9) Secure the motor (800) to the motor bracket with the hexagon bolt (120-13). (4.0 kW or less
models only)
Rotate the coupling manually, and check that the rotation is smooth and
Note
uniform. Please readjust the coupling if there is
(10) Secure the coupling guard (245) to the motor bracket (162) with the cross-recessed head
machine screws (a total of 4 on both sides, 130-2).
*
The cartridge mechanical seal (111) can be requested from the store from which you purchased
this item. (Refer to
7
. Maintenance for a table of dimensions)
- 25 -
EVMS/EVMSL
nonuniformity.
EBARA
CORPORATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

25evms125.5525evms165.7525evms2551.125evms3351.525evms3952.225evms45.37 ... Show all

Table of Contents