Function Test During Commissioning - Pilz PSSu E F 2DO 2 Operating Manual

Hide thumbs Also See for PSSu E F 2DO 2:
Table of Contents

Advertisement

Wiring
6.4

Function test during commissioning

An error must be simulated for each safety-related output during commissioning: The anti-
cipated error reaction must occur when an output has a short circuit to a supply voltage.
Operating Manual PSSu E F 2DO 2(-T)(-R)
21322-EN-07
INFORMATION
The short circuit test must be performed on the load and not on the output
terminal.