Step 6 Install Filters; Step 7 Install Implement Rods; Finalize Installation - Monogram ZV48SSJSS Installation Instructions Manual

Professional vent hood
Hide thumbs Also See for ZV48SSJSS:
Table of Contents

Advertisement

STEP 6 INSTALL FILTERS

• Insert the grease filter into the opening and drop into
the trays.
filter up and lift out.
31-2000859 Rev. 0
Installation Instructions
STEP 7 INSTALL IMPLEMENT
RODS
Template for
Monogram
nameplate
Monogram
nameplate
• Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
hole towards the inside of the hood. Secure the rod
• Install knobs - line up the flat on the shaft with the
flat in the knob hole.
template on page 14 for alignment of the nameplate.
Cut out the template and tape it onto the hood
front surface and verify the template is aligned with
the left side of the hood and within the upper and
the nameplate first before removing the adhesive
release paper.

FINALIZE INSTALLATION

• Install the supplied infrared bulb(s).
• See the Owner's Manual for instructions to test
operation.
Screw
Stand-offs
Into
Hood
Use Allen
Wrench to
Secure Rod
to Stand-offs
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZV48SSJSS and is the answer not in the manual?

This manual is also suitable for:

Zv36ssjss

Table of Contents