Tools And Materials Required - Monogram ZV48SSJSS Installation Instructions Manual

Professional vent hood
Hide thumbs Also See for ZV48SSJSS:
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Duct tape
Spirit level
Metal Snips
CAUTION
Lift the hood by grasping
the outside edges of the inlet opening of the hood.
Do not lift the hood by grasping the exhaust opening
or transition duct with damper!
PRECAUCIÓN
Soulevez la hotte en agrippant
pas la hotte en agrippant l'orifice d'évacuation ou le
conduit de transition avec le registre!
ADVERTENCIA
Levante la campana tomando los
campana. ¡No levante la campana tomando la abertura
de la salida de aire o el conducto de transición con el
regulador!
• Open the carton and remove the hood and packaging.
• Confirm that all hardware and parts are present by
Installation Instructions.
• Loosen the screws holding the wood support to the back
of the hood. Remove wood support. Keep wood support
and screws. These will be used to mount the hood to the
wall.
material has been removed from the hood and transition
duct with damper
31-2000859 Rev. 0
Installation Preparation
stripper
Safety glasses
Step ladder
Saber saw
or Sawsall
Ne soulevez
Hammer
Key Hole Saw
grounded branch circuit.
Do not lift from transition duct
Carton
Top view of open shipping carton
Electric or battery operated
10" round metal
suit installation.
blade screwdrivers
Strain relief for
junction cover.
Hood
Lift hood out of
carton from the sides
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZV48SSJSS and is the answer not in the manual?

This manual is also suitable for:

Zv36ssjss

Table of Contents