Quick Setup Instructions - Digi ConnectPort X4 IA Quick Start Manual

Hide thumbs Also See for ConnectPort X4 IA:
Table of Contents

Advertisement

TM
DISPLAY SCREEN DIAGRAM
LCD Screen:
Screen Name or Units

Diagnostic Alert
Logo

Numeric Data
Buttons:
(Up)
Select
+
(Left)
Back
(Down)
Select
ZL0067-0B
PAGE 7
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
E51
Alive Indicator
Export
Import
Tx
Rx
ERR
Transmit Data
Receive Data
Receive Data Error
(Right)
Next
©2011 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
INSTALLATION GUIDE

QUICK SETUP INSTRUCTIONS

These instructions assume the meter is set to factory defaults. If it has been
previously configured, all optional values should be checked.
+
1. Press the
or
button repeatedly until SETUP screen appears.
+
2.
to the PASWD screen.
+
3.
through the digits. Use the
+
or
is 00000). Exit the screen to the right.
+
4. Use the
or
buttons to select the parameter to configure.
+
5. If the unit has an RS-485 interface, the first Setup screen is S COM (set
communications).
a.
to the ADDR screen and through the address digits. Use the
buttons to select the Modbus address.
b.
to the BAUD screen. Use the
c.
to the PAR screen. Use the
d.
back to the S COM screen.
6.
to the S CT (Set Current Transducer) screen. If this unit does not have an RS-
485 port, this will be the first screen.
a.
to the CT V screen. Use the
mode Current Transducer output voltage.
b.
to the CT SZ screen and through the digits. Use the
to select the CT size in amps.
c.
back to the S CT screen.
7.
to the S SYS (Set System) screen.
a.
to the SYSTM screen. Use the
Type (see wiring diagrams).
b.
back to the S SYS screen.
8. (Optional)
to the S PT (Set Potential Transformer) screen. If PTs are not used,
then skip this step.
a.
to the RATIO screen and through the digits. Use the
to select the Potential Transformer step down ratio.
b.
back to the S PT screen.
9.
to the S
V (Set System Voltage) screen.
a.
to the VLL (or VLN if system is 1L-1n) screen and through the digits.
+
Use the
or
buttons to select the Line to Line System Voltage.
+
b.
back to the S V screen.
10. Use the
to exit the setup screen and then SETUP.
11. Check that the wrench is not displayed on the LCD.
a. If the wrench is displayed, use the
screen.
b.
through the screens to see which alert is on.
For full setup instructions, see the configuration instructions on the following pages.
buttons to select the password (the default
+
+
+
or
buttons to select the baud rate.
+
+
+
or
buttons to select the parity.
+
or
buttons to select the voltage
+
+
+
or
+
+
or
buttons to select the System
+
or
+
+
or
buttons to find the ALERT
+
or
buttons
buttons
03112

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ConnectPort X4 IA and is the answer not in the manual?

Questions and answers

Table of Contents