ABB REL670 Installation And Commissioning Manual page 81

Line distance protection ied
Hide thumbs Also See for REL670:
Table of Contents

Advertisement

Overview
Chapter 11
Verifying settings by secondary
injection
Note!
Please observe the measuring accuracy of the IED, the test equipment and the angular accuracy
for both of them.
Note!
Please consider the configured logic from the function block to the output contacts when mea-
suring the operate time.
73

Advertisement

Table of Contents
loading

Table of Contents