Overview
Chapter 11
Verifying settings by secondary
injection
Note!
Please observe the measuring accuracy of the IED, the test equipment and the angular accuracy
for both of them.
Note!
Please consider the configured logic from the function block to the output contacts when mea-
suring the operate time.
73