ABB REL670 Installation And Commissioning Manual page 100

Line distance protection ied
Hide thumbs Also See for REL670:
Table of Contents

Advertisement

Test point
Value
8
=
X
0.2
RLdFw
=
R
0.2 RLdFw
9
2
=
X
0.2
3
2
=
R
0.2
3
10
2
=
X
0.85
2
=
R
0.85
3
11
2
=
X
0.2
3
=
R
0.2
3 tan(60 )
12
X=0
R= RFFwPE
92
Distance protection
tan(
ArgLd
)
[
]
+
X
1 XN
[
]
+
X
1 XN tan(
AngNegDir
[
]
+
X
1 XN
3
[
]
+
X
1 XN tan(
ArgNegDir
[
]
+
X
1 XN
[
2
]
+
X
1 XN
°
The table showing test points for phase to earth loops is used together with
Comments
X
0.346 RLdFw
X
0.231
R
0.108
°
90 )
X
0.981
R
0.458
90)
X
0.231
R
0.133
Note! This test points is proposed to be used instead of
point 4, 5 and 6 when shaped load characteristic is not
activated (OperationLdCmd=OFF)
Verifying settings by secondary
[
]
+
X set
1
XN
[
]
+
X
1 XN
[
]
+
X
1 XN
[
]
+
X
1 XN
[
]
+
X
1 XN
[
]
+
X
1 XN
figure
Chapter 11
injection
28.

Advertisement

Table of Contents
loading

Table of Contents