ABB REL670 Installation And Commissioning Manual page 137

Line distance protection ied
Hide thumbs Also See for REL670:
Table of Contents

Advertisement

10.2.3
Secondary system supervision
2
3 U
U
a
U
=
+
+
2
L 1
L 2
Where:
U
U
and
L1
L2
2 π
---------- -
j
3
,
a
=
1 e
=
0 5
+
j
4.
Compare the result with the set value (consider that the set value
3U2> is in percentage of the base voltage U1b) of the negative-se-
quence operating voltage.
Measuring the operate value for the zero sequence function
Measure the operate value for the zero sequence function, if included in the IED.
Procedure
1.
Simulate normal operating conditions with the three-phase currents
in phase with their corresponding phase voltages and with all of
them equal to their rated values.
2.
Slowly decrease the measured voltage in one phase until the BLKU
signal appears.
3.
Record the measured voltage and calculate the corresponding ze-
ro-sequence voltage according to the equation.
Observe that the voltages in the equation are phasors.
3 U
=
U
+
U
+
U
0
L1
L2
L3
Where:
= the measured phase voltages.
U
, U
and U
L 1
L2
L 3
4.
Compare the result with the set value (consider that the set value
3U0> is in percentage of the base voltage U1b) of the zero-sequence
operating voltage.
a
U
L3
= the measured phase voltages
U
L3
3
------ -
2
Chapter 11
Verifying settings by secondary
injection
(Equation 1)
(Equation 2)
129

Advertisement

Table of Contents
loading

Table of Contents