Maintenance Plan; View Information; Safe Disposal And Recycling - Mindray BeneFusion VP3 Vet Operator's Manual

Infusion pump
Table of Contents

Advertisement

11.2 Maintenance Plan

The following tasks must be conducted by professional maintenance personnel
approved by the company. Please contact the company if the following
maintenances are needed. Must clean and disinfect the device before the test or
maintenance.
Inspection/Maintenance Items
Perform a safety inspection according
to the IEC60601-1 standard.
Preventive maintenance (refers to the
Maintenance Manual for pressure
calibration, sensor calibration, and
pump inspection).

11.3 View Information

Select [Main Menu]→ [History Record]. In the [History Record] interface, you can
view the infusion parameters, alarm information, operation information and other
information.
Select [Main Menu]→[System Options]→[Version Information]. In the [Version
Information] interface, you can view the Software Version, Brand Library Version
and other versions.

11.4 Safe Disposal and Recycling

Please contact the company for related information about safe disposal and
recycling.
Frequency
Once every two years. Perform after the
board is changed or the infusion pump is
accidentally dropped.
Once every two years, or when you
suspect the occlusion alarm is abnormal,
the flow volume is inaccurate, or the
infusion set is incorrectly identified.
11-2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BeneFusion VP3 Vet and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF