Checks
PERFORATED DISK and SEAL UNDER THE PAD
Every 4 months, replace
the shower (2) and
gasket under the pad
of the dispenser (4)
group (we
recommend
to use only
genuine parts)
proceeding
as follows:
1
•
loosen the screw (
1);
•
remove the containment ring (
•
replace the perforated disk (
2) and the seal under
the pad (4);
•
reassemble the components
Verify the correct
operation of the
pressure
limiting valve and
non-return drain valve
as follows:
PRESSURE RELIEF VALVE
•
block the pressure switch contacts;
•
wait for the boiler pressure to increase
that the valve activates at the maximum pressure
of 2 bar.
NON-RETURN DRAIN VALVE
•
activate the delivery groups for about 30 sec-
onds;
•
attach a filter holder (
5) with pressure gauge
(available on request) to the group;
•
activate the delivery group, and use the pressure
gauge (6) to monitor the pressure as it increases
up to 8-9 bar;
•
check the increase in the pressure due to the
expansion of the heated water up to a value of
approximately 12 bar: reaching this value confi rms
proper operation of the valve, as well as of the
gaskets and solenoid valves seal;
•
check the other delivery groups.
Technical manual
4
X
3
2
3);
5
6
and check
Checks
•
Verify the correct functioning of the PRESSURE
SWITCHES
•
Check for LIME SCALE on heating elements and
boilers.
•
Check the effi ciency of the SOLENOID VALVES of
the delivery groups.
•
Check for any HYDRAULIC LEAKS and for the ef-
fi ciency of the drains.
X
Wegaconcept
X
31