Taylor C612 Operator's Manual page 41

Combination freezer
Table of Contents

Advertisement

10. Assemble the feed tube assembly. Slide the check
ring into the groove of the feed tube. 
(See Figure 6-37.)
Figure 6-37
11. Install one red O-ring on each end of the mix feed
tube, and thoroughly lubricate them. 
(See Figure 6-38.)
Figure 6-38
12. Lay the pump assembly, pump clip, cotter pin, and
agitator in the bottom of the mix hopper for sanitizing. 
(See Figure 6-39.)
Figure 6-39
Operating Procedures
13. Slide the large black O-ring and the two smaller black
O-rings into the grooves on the driveshaft.
Thoroughly lubricate the O-rings and shaft. Do not
lubricate the hex end of the shaft. (See Figure 6-40.)
14. Install the hex end of the driveshaft into the drive hub
at the rear wall of the mix hopper. (See Figure 6-41.)
Note:
For ease in installing the pump, put the ball crank
of the driveshaft in the 3 o'clock position.
Model C612
OPERATING PROCEDURES
Figure 6-40
Figure 6-41
6
6-9

Advertisement

Table of Contents
loading

Table of Contents