Taylor C612 Operator's Manual page 39

Combination freezer
Table of Contents

Advertisement

17. Slide the two shorter drip pans into the holes in the
rear panel. Slide the two drip pans with holes into the
left and right side panels. (See Figure 6-27.)
Figure 6-27
18. Install the front drip tray and splash shield under the
door spouts. (See Figure 6-28.)
Figure 6-28
Mix Pump Assembly
1. Inspect the rubber and plastic pump parts. The
O-rings, check rings, and gaskets must be in good
condition for the pump and entire machine to operate
properly. They cannot properly serve their intended
function if nicks, cuts, or holes in the material are
present.
Inspect the plastic pump parts for cracks, wear, and
delamination of plastic.
Replace and discard any damaged parts
immediately.
Operating Procedures
2. Assemble the piston. Slide the red O-ring into the
groove of the piston. Do not lubricate the O-ring.
(See Figure 6-29.)
3. Apply a thin layer of lubricant to the inside of the
pump cylinder at the retaining pin end. 
(See Figure 6-30.)
4. Insert the piston into the retaining pin end of the
pump cylinder. (See Figure 6-31.)
Model C612
OPERATING PROCEDURES
Figure 6-29
Figure 6-30
Figure 6-31
6
6-7

Advertisement

Table of Contents
loading

Table of Contents