System Testing; Testing Xls100 Systems; Testing Xls1000 Systems - Honeywell XLS-REL Technical Reference Manual

Releasing module
Table of Contents

Advertisement

Programming the XLS-REL

System testing

2.14
Warning! Disconnect the release circuit until system testing is
complete and the system is stable.

Testing XLS100 systems

Allow the system sufficient time to stabilize after the initial
startup or download. Before you test the system, access the SDC
Status tool in the XLS100-SDU. Do not test the system if the
status LEDs indicate anything pending or in progress. This
includes:
Mapping
Device new starts
Resets
Restarts

Testing XLS1000 systems

Allow the system sufficient time to stabilize after the initial
startup or download. Before you test the system, access the
DSDC Status tool in the XLS1000-SDU. Do not test the system if
the status LEDs indicate anything pending or in progress. This
includes:
Mapping
Device new starts
Resets
Restarts
In the XLS1000-SDU (Rev 2.0), you can test the system while
the Device Supervision LED is on. The Device Supervision LED
may be on longer for larger loops.
XLS-REL Technical Reference Manual

Advertisement

Table of Contents
loading

Table of Contents