Logging commissioning

After initial start-up of the system has been carried out, the log must be completed and signed by those
involved (see the form depicted on the folloiwng pages).
Page 4-2
Initial commissioning
Section 2 – Operating Instructions
Switch cabinet drilling pattern
View from below
Rev. 2.8 Date 2019-02-04
Software version 1.00