3.

Work prior to commissioning

3.1

Requirements at the place of installation

Foundation:
Installation area for a load of at least 50 kg.
Set-up location:
No shaking or vibrations
Acid-resistant floor covering
Space required for operation and maintenance:
0.5 m space all the way round the system.
3.2

On-site connections to media supply

3.2.1

Electrical connection

The system is connected to the 100–240 V / 50/60 Hz power supply via the system plug.
Heed on-site fuse protection according to requirements (VDE). Socket protected by FI 30mA.
3.2.2

Hydraulic connection

ATTENTION Care must be taken that the hydraulic part of the system can be installed under the minimum
Before commissioning, the following work must be carried out by the customer / a service technician:
Set-up and alignment of the system
Installation of the electrical connection
Installation of hydraulic connection
Initial commissioning incl. language selection in the menu navigation
Fill in commissioning log
3.3

Setup and alignment of the system

The system is set up on a level base near the planned concentrate storage tanks. Care must be taken that
the connections and operating elements are accessible.
Rev. 2.8 Date 2019-02-04
Software version 1.00
tank level.
Work prior to commissioning
Section 2 – Operating Instructions
CCS
Page 3-1