Day Of System Handover; Maintenance And Servicing Personnel; The System Was Handed Over To The Customer By - B. Braun Aquaboss CCS Instructions For Use Manual

Table of Contents

Advertisement

CCS
1.4

Day of system handover

1.5

Maintenance and servicing personnel

The following persons have been named by the customer and have been instructed and trained on
the system by B. Braun and made aware of the following points:
protective equipment, dangerous areas, inadmissible operation, set-up, operation, routine check
and repair.
1.6

The system was handed over to the customer by

Page 1-2
Handover declaration for the operating instructions
Section 2 – Operating Instructions
..............................................................................................................................
..................................................
Name (customer staff)
..................................................
Name (customer staff)
..................................................
Name (customer staff)
B. Braun commissioning log
Customer-specific commissioning log
Company stamp/Customer's signature
Name, block letters
..............................................................................................................................
..................................................
Date
......................................................................
Signature
......................................................................
Signature
......................................................................
Signature
......................................................................
Signature
Rev. 2.8 Date 2019-02-04
Software version 1.00

Advertisement

Table of Contents
loading

Table of Contents