Connecting Two Or More Energy Storage Solutions In Parallel - Koch 2.0 Series Operating Manual

Energy storage solutions
Table of Contents

Advertisement

Available languages

Available languages

5 Commissioning
5.2
22
Operating manual Energy storage solutions
V1.3DE/EN
Fig. 10: Indicator LED, on the top of the housing
Connect the power to the DC link.
After about 10 seconds, the indicator LED t on the top of the housing will flash
(as the energy increases, it will flash faster).
After another 10 seconds, the Energy storage solution will be ready for use
(This time will increase by 5 seconds for each extension module).
Energy storage solution is connected to the DC link.

Connecting two or more Energy storage solutions in parallel

Several Energy storage solutions may also be connected to the DC link in parallel by
the "–DC" (black), "BR" (grey) and "+DC" (red) terminals. Procedure according to
(
Chapter 5.1).
5

Advertisement

Chapters

Table of Contents
loading

Related Products for Koch 2.0 Series

This manual is also suitable for:

3.0 series

Table of Contents