Install the Energy storage solution according to the drilling template, vertically,
using four bolts (M6) as follows.
Screw in the two top bolts first of all, hook in the Energy storage solution and then
screw in the two bottom bolts.
The power connection is at the bottom.
Tighten all bolts by hand and check for firm seating.

Earthing the Energy storage solution

Fig. 4: Earthing connection (on the bottom of the housing)
Earth the Energy storage solution using the earthing connection q
(cross-section as specified in national standard).
Carry out a safety inspection according to German standard BGV A3.