Seagull Models PC-9 Assembly Manual page 19

Hide thumbs Also See for PC-9:
Table of Contents

Advertisement

www.seagullmodels.com
M3 lock nut.
Control horn.
A.
Elevator Pushrod.
Metal clevis.
C/A.
ELEVATOR PUSHROD HORN
A.
INSTALLATION.
ELEVATOR PUSHROD HORN
INSTALLATION.
1) Thread one clevis and M3 lock nut on
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
2) Elevator pushrods assembly follow
pictures below.
Pushrod L= 125mm.
Control horn.
M3 lock nut.
M lock
3
Metal Levis.
Rudder pushrod.
Metal clevis.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

5500052

Table of Contents